Railway infrastructure works - Uccle

Description 

The project consisted of infrastructure work along the track bed platform where railway lines L124 and L26 intersect. Several bridge decks were renovated and noise barriers installed, including 2,000 m² of green walls. For the Moensberg station at Uccle, new platforms have been built. Simultaneous with these main works diverse road, bedding, demolition, earth- and sewerage works were performed.

Some figures:

  • Earthworks: 50,500 m³.
  • Steel delivered: 680 tonnes.
  • Concrete TPG: 8,800 m³.

Willemen Bouw was established on 30 April 2025 through the merger of Willemen Construct, Cosimco, Franki Construct and Tools.

 
location 

Project Details

Contractor
Horzelstraat 300, Ukkel, Brussels, Belgium
Client 
Infrabel
Engineering Office 
TUC Rail
Construction period
3 years 5 months
Start work
01-2011
End of work
06-2014